- Home
- Departments
- Engineering
Engineering
Pavement Dashboard
One of the tools that the Engineering Department uses when making plans for street improvements is the Pavement Dashboard.
A filter can be applied to the data so that only one type of pavement is displayed at a time such as brick, concrete, asphalt, or oil and chip.
A pavement condition index (PCI) filter can also be applied so that only streets with a PCI under a selected value are displayed.
The Pavement Dashboard can be viewed here.
Improving Our City, Project by Project
The below are examples of some of the projects and tasks that have recently been completed by Belleville's Engineering Department.
-
36-inch diameter storm water pipe replacement on Green Mount Lane
-
18-inch diameter stormwater pipe replacemnt on Southgate Drive
-
Sidewalk curb ramp replacement at Walnut Street and East 'D' Street
-
Pavement patching on Lake Forest Drive
-
Pavement patching on Chestnut Drive
-
Failed Inlet Repair on Golf Course Drive
-
Stormwater Ditch Improvements for Forest Gate Drive
-
Failed Culvert Replacement on South Church Street
-
Repairs and Rebuilding Failed Inlets on Pro Tour Drive
-
Failed Culvert Replacement on Country Club Acres
Contact Us
-
Scott Saeger, P.E.
City Engineer
ssaeger@belleville.netPh: 618-233-6810, x4252
2300 W. Main St.
Bldg M / Suite M116
Belleville, IL 62226Ph: 618-233-6518, x4272
Hours
Mon - Fri
8:00 a.m. - 5:00 p.m.